#2 of the images The “ultra-rare” tour to the top of the main tower of the Rainbow Bridge, which celebrated its 30th anniversary, was conducted by an extremely high-demanding 73 times higher than the average! | FRIDAY DIGITAL

Rainbow Bridge at the time of construction. Construction began in 1987 and took six years to complete.

share iconShare on SNS

  • Share on Twitter
  • Share on LINE
FRIDAY DIGITAL
Back to Article

The “ultra-rare” tour to the top of the main tower of the Rainbow Bridge, which celebrated its 30th anniversary, was conducted by an extremely high-demanding 73 times higher than the average!

2/6

Access Ranking

See more rankings